Save the Project for Failure
by in Feature Articles on 2012-01-31If it takes two contract developers six months to drive a project to failure, then four developers should be able to fail in half the time! Josh assumed that was why he and Sam were carted out to the client site and tossed into the oubliette of the PowerPac project. They were armed with nothing but a rusty spoon and a requirements document so old it needed to be stored in an oxygen-free environment.
The original development pair was Sally "I can code but I'm more of a designer" Jorgensen (the CEO's daughter) and Billy "I taught myself HTML in a week and am now a programmer" Jorgensen (the CEO's brother). They ran the project exactly like you'd expect such a dynamic duo to run it- directly into the ground. By the time Josh and Sam joined, it was already well past deadline and over budget.